SPIVEY PIT RD over BRANCH NO NAME

.2 MI N OF AL 10 · County 005, Alabama · Built 1991 · 2 Lanes · 40 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015330
Year Built
1991
Length
10.4 m (34.1 ft)
Max Span
10.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
40
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$316,000
Total Project Cost
$348,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.