I 65 over SR 3

JCT I 65 & SR 3 · County 103, Alabama · Built 1964 · 2 Lanes · 15,465 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
008190
Year Built
1964
Length
98.8 m (324.1 ft)
Max Span
27.1 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
15,465
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,446,000
Total Project Cost
$2,691,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.