ST CLAIR CO HW 79 over BROKEN ARROW CREEK

0.3 MI NW REFUGE CHURCH · County 115, Alabama · Built 1990 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
015213
Year Built
1990
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
350
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$842,000
Total Project Cost
$926,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.