ST CLAIR CO HW 78 over BROKEN ARROW CREEK

0.6 MI N HARKEYS CHAP.CH. · County 115, Alabama · Built 1994 · 2 Lanes · 450 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
003375
Year Built
1994
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
450
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$652,000
Total Project Cost
$717,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.