US 43 over WARRIOR RIVER RELIEF

1.4 MI N MARENGO CO LINE · County 063, Alabama · Built 1989 · 2 Lanes · 3,973 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
014852
Year Built
1989
Length
72.5 m (237.9 ft)
Max Span
10.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
3,973
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,669,000
Total Project Cost
$2,936,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.