US 43 over RELIEF

.1MI. N OF DEMOPOLIS · County 091, Alabama · Built 1988 · 2 Lanes · 4,640 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014531
Year Built
1988
Length
155.4 m (509.8 ft)
Max Span
10.4 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
4,640
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,142,000
Total Project Cost
$5,656,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.