I85 SBL over AL. 81

AL. 81 EXIT · County 087, Alabama · Built 1964 · 2 Lanes · 16,355 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

32.472864, -85.692414

This bridge is in worse condition than 74.4% of bridges in County 087. The average bridge in Alabama is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
014744
Year Built
1964
Reconstructed
1989
Length
46 m (150.9 ft)
Max Span
15.5 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
16,355
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,765,000
Total Project Cost
$1,942,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.