I-85 S.B.L. over AL. 199

I-85 OVER AL. 199 · County 087, Alabama · Built 1964 · 2 Lanes · 15,625 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 7 Good

Location

32.470294, -85.700764

This bridge is in worse condition than 74.4% of bridges in County 087. The average bridge in Alabama is 0 years old; this one is 62 years old.

Nearby Bridges

Bridge Details

Structure #
008208
Year Built
1964
Length
94.8 m (311 ft)
Max Span
24.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
15,625
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,360,000
Total Project Cost
$2,596,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.