CR-35 over I-22

14.5 MP on I-22/ CR-35 · County 093, Alabama · Built 1988 · 2 Lanes · 1,859 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
014646
Year Built
1988
Length
92.7 m (304.1 ft)
Max Span
30.5 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
1,859
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,226,000
Total Project Cost
$3,549,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.