I-22 over Buttahatchee River

2.8 MI W OF AL-171 · County 093, Alabama · Built 1988 · 2 Lanes · 12,289 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014645
Year Built
1988
Length
264.3 m (867.1 ft)
Max Span
27.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
12,289
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,793,000
Total Project Cost
$8,572,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.