I-22 over Branch

0.5 MI S AL-19 · County 093, Alabama · Built 1988 · 4 Lanes · 12,221 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
014641
Year Built
1988
Length
134.1 m (440 ft)
Max Span
2.4 m
Lanes
4
Daily Traffic
12,221
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$34,412,000
Total Project Cost
$37,853,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.