AL-74 over I-22

7.8 MP on I-22/AL-74 · County 093, Alabama · Built 1988 · 3 Lanes · 2,170 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

34.167222, -88.065167

This bridge is in worse condition than 54.9% of bridges in County 093. The average bridge in Alabama is 0 years old; this one is 38 years old.

Nearby Bridges

Bridge Details

Structure #
014503
Year Built
1988
Length
92.7 m (304.1 ft)
Max Span
28 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
2,170
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,786,000
Total Project Cost
$4,165,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.