IN 85 over UNION ST

1.3 MI N OF I65 · County 101, Alabama · Built 1970 · 6 Lanes · 83,530 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 4 Poor
Substructure 5 Fair

Location

32.367889, -86.300072

This bridge is in worse condition than 97.8% of bridges in County 101. The average bridge in Alabama is 0 years old; this one is 56 years old.

Nearby Bridges

Bridge Details

Structure #
014467
Year Built
1970
Reconstructed
1988
Length
51.5 m (169 ft)
Max Span
19.5 m
Width
33.8 m (110.9 ft)
Lanes
6
Daily Traffic
83,530
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,657,000
Total Project Cost
$5,123,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.