I85 over DECATUR ST

1.18 MI N OF I65 · County 101, Alabama · Built 1966 · 6 Lanes · 83,530 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 7 Good

Location

32.367861, -86.302108

This bridge is in worse condition than 81.2% of bridges in County 101. The average bridge in Alabama is 0 years old; this one is 60 years old.

Nearby Bridges

Bridge Details

Structure #
014465
Year Built
1966
Reconstructed
1988
Length
54.6 m (179.1 ft)
Max Span
20.7 m
Width
33.8 m (110.9 ft)
Lanes
6
Daily Traffic
83,530
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,895,000
Total Project Cost
$5,385,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.