I 65 over PATTONS CK

.1 MI. NO. HOOVER INTER · County 073, Alabama · Built 1972 · 9 Lanes · 117,910 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
014419
Year Built
1972
Reconstructed
1988
Length
21.4 m (70.2 ft)
Max Span
3.7 m
Lanes
9
Daily Traffic
117,910
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,374,000
Total Project Cost
$11,411,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.