I - 65 over AL - 3

HOOVER INTERCHANGE · County 073, Alabama · Built 1972 · 6 Lanes · 117,910 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
014418
Year Built
1972
Reconstructed
1988
Length
96.9 m (317.9 ft)
Max Span
43.3 m
Width
41.1 m (134.8 ft)
Lanes
6
Daily Traffic
117,910
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,772,000
Total Project Cost
$10,749,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.