SR 275 over NORFOLK SOUTHERN R/R

CITY OF TALLADEGA · County 121, Alabama · Built 1986 · 2 Lanes · 10,625 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014025
Year Built
1986
Length
52.7 m (172.9 ft)
Max Span
22.3 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
10,625
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,986,000
Total Project Cost
$2,185,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.