SR 275 over BRANCH

CITY OF TALLADEGA · County 121, Alabama · Built 1986 · 2 Lanes · 10,625 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
014024
Year Built
1986
Length
15.1 m (49.5 ft)
Max Span
3.6 m
Lanes
2
Daily Traffic
10,625
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,371,000
Total Project Cost
$2,608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.