I-65 over US 90

I-65 @ US 90 · County 097, Alabama · Built 1961 · 8 Lanes · 89,739 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
013806
Year Built
1961
Reconstructed
1986
Length
83.2 m (273 ft)
Max Span
22.9 m
Width
44.4 m (145.7 ft)
Lanes
8
Daily Traffic
89,739
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,264,000
Total Project Cost
$10,190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.