US 90 WB over WRAGG SWAMP CANAL

0.5 MI W I-65 · County 097, Alabama · Built 1959 · 3 Lanes · 16,868 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
006578
Year Built
1959
Reconstructed
2003
Length
72.5 m (237.9 ft)
Max Span
10.4 m
Width
15.8 m (51.8 ft)
Lanes
3
Daily Traffic
16,868
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,896,000
Total Project Cost
$3,186,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.