SR 225 over MARTIN BRANCH

4.5 MI N CO RD 138 · County 003, Alabama · Built 1985 · 2 Lanes · 2,546 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
013700
Year Built
1985
Length
30.5 m (100.1 ft)
Max Span
10.4 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,546
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$880,000
Total Project Cost
$968,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.