I-65 NB over SR 59

I-65 @ SR 59 · County 003, Alabama · Built 1967 · 2 Lanes · 12,571 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

30.953589, -87.822356

This bridge is in worse condition than 83% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 59 years old.

Nearby Bridges

Bridge Details

Structure #
009245
Year Built
1967
Length
54.6 m (179.1 ft)
Max Span
20.7 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
12,571
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,868,000
Total Project Cost
$2,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.