CO RT 147 over PEA RIVER

2.3 MI S OF NEW HOPE · County 031, Alabama · Built 1984 · 2 Lanes · 225 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013338
Year Built
1984
Length
141.7 m (464.9 ft)
Max Span
30.5 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
225
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,078,000
Total Project Cost
$3,386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.