AL-18 over North River

0.2 MI E JCT SR 13 · County 057, Alabama · Built 1984 · 2 Lanes · 1,893 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013289
Year Built
1984
Length
95.9 m (314.6 ft)
Max Span
23.3 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
1,893
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,672,000
Total Project Cost
$2,939,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.