Al-13 over Clear Creek

2.0 MI N SR 18 · County 057, Alabama · Built 1957 · 2 Lanes · 2,032 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
005845
Year Built
1957
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
2,032
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,830,000
Total Project Cost
$2,013,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.