SR 10 MP 187.207 over PEA RIVER

.9 MI.E.PIKE 83 · County 109, Alabama · Built 1984 · 2 Lanes · 1,760 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013264
Year Built
1984
Length
223.7 m (733.9 ft)
Max Span
24.4 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
1,760
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,443,000
Total Project Cost
$7,087,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.