AL.185 over L*N RR

3.0 MI.S.OF I65 · County 085, Alabama · Built 1982 · 2 Lanes · 3,570 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

31.986717, -86.576603

This bridge is in worse condition than 68.8% of bridges in County 085. The average bridge in Alabama is 0 years old; this one is 44 years old.

Nearby Bridges

Bridge Details

Structure #
012834
Year Built
1982
Length
38.4 m (126 ft)
Max Span
14 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
3,570
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,114,000
Total Project Cost
$1,225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.