I65 over BRANCH

I65 AND AL.185 INTERCHANG · County 085, Alabama · Built 1966 · 4 Lanes · 29,840 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
008987
Year Built
1966
Length
20.4 m (66.9 ft)
Max Span
2.1 m
Lanes
4
Daily Traffic
29,840
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,981,000
Total Project Cost
$6,579,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.