CR-77 over Socapatoy Creek

1.22 MI. NW KELLYTON · County 037, Alabama · Built 1978 · 2 Lanes · 527 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
012037
Year Built
1978
Length
14.6 m (47.9 ft)
Max Span
7.3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
527
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$382,000
Total Project Cost
$420,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.