AL 9 over SOCAPATOY CRK.

0.4 MI N JCT US 280 · County 037, Alabama · Built 1924 · 2 Lanes · 3,445 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
001154
Year Built
1924
Reconstructed
1935
Length
11.6 m (38.1 ft)
Max Span
11 m
Width
7.6 m (24.9 ft)
Lanes
2
Daily Traffic
3,445
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$302,000
Total Project Cost
$332,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.