PERRY HILL RD over DRAINAGE DITCH

50 FT N OF BETH MANOR DR · County 101, Alabama · Built 1978 · 5 Lanes · 9,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
012001
Year Built
1978
Length
10.4 m (34.1 ft)
Max Span
10.4 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
9,000
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$937,000
Total Project Cost
$1,031,000