HARRISON RD over SHERWOOD DITCH

0.2 MI W OF PERRY HILL RD · County 101, Alabama · Built 1965 · 2 Lanes · 3,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
008773
Year Built
1965
Length
14.6 m (47.9 ft)
Max Span
7.3 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
3,500
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$397,000
Total Project Cost
$437,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.