US 82 MP 235.184 over CRAZY CREEK

2.7 MI.E.BARBOUR 89 · County 005, Alabama · Built 1978 · 2 Lanes · 2,070 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
011970
Year Built
1978
Length
11.4 m (37.4 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
2,070
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$840,000
Total Project Cost
$924,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.