US 82 MP 232.766 over STREAM

.3 MI.E.BARBOUR 89 · County 005, Alabama · Built 1929 · 2 Lanes · 1,870 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
011895
Year Built
1929
Reconstructed
1978
Length
9.1 m (29.9 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
1,870
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$705,000
Total Project Cost
$776,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.