US 80 WBL over BIG SWAMP CREEK RELIEF

4.5 MI. W. OF LOWNDESBORO · County 085, Alabama · Built 1976 · 2 Lanes · 4,275 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
011607
Year Built
1976
Length
62.2 m (204.1 ft)
Max Span
10.4 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
4,275
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,091,000
Total Project Cost
$2,300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.