US 80 EBL over BIG SWAMP CREEK RELIEF 1

5.3 MI. W. OF LOWNDESBORO · County 085, Alabama · Built 1946 · 2 Lanes · 4,275 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
002918
Year Built
1946
Length
62.2 m (204.1 ft)
Max Span
10.4 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
4,275
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,394,000
Total Project Cost
$1,533,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.