I - 59 SOUTH over OPORTO MADRID BLVD

I 59 * 77 TH ST · County 073, Alabama · Built 1976 · 3 Lanes · 33,120 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
011559
Year Built
1976
Length
60.5 m (198.5 ft)
Max Span
26.2 m
Width
16.5 m (54.1 ft)
Lanes
3
Daily Traffic
33,120
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,625,000
Total Project Cost
$2,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.