I - 20 EAST over OPO MADRID BLVD
I20 * OPORTO BLVD · County 073, Alabama · Built 1974 · 2 Lanes · 22,755 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.53425, -86.720769
This bridge is in worse condition than 35.5% of bridges in County 073. The average bridge in Alabama is 0 years old; this one is 52 years old.
Nearby Bridges
I - 59 SO RAMP over 80th St. North
Built 1976
I - 59 NORTH over 77TH STREET
Built 1976
I - 59 SOUTH over OPORTO MADRID BLVD
Built 1976
I - 20 WEST over OPO MADRID BLVD
Built 1974
OPORTO-MADRID BLV over GEORGIA RD * RR
Built 1967
I - 20 EAST over MONTEVALLO RD
Built 1974
I - 20 WEST over MONTEVALLO ROAD
Built 1974
I - 20 EAST over US 78 (AL-4)
Built 1974
I - 20 WEST over US 78 (AL-4)
Built 1974
ELDER STREET over SHADES CREEK
Built 1951
Bridge Details
- Structure #
- 011067
- Year Built
- 1974
- Length
- 73.5 m (241.1 ft)
- Max Span
- 32 m
- Width
- 12.4 m (40.7 ft)
- Lanes
- 2
- Daily Traffic
- 22,755
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,299,000
- Total Project Cost
- $2,529,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.