RAMP 51 over HOLT ST.AND W.JEFF DAVIS
I65 N TO I85 N · County 101, Alabama · Built 1971 · 2 Lanes · 7,440 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.366108, -86.320464
This bridge is in worse condition than 81.2% of bridges in County 101. The average bridge in Alabama is 0 years old; this one is 55 years old.
Nearby Bridges
RAMP 54 over HOLT ST
Built 1973
I65 SBL over RAMPS AND JEFF DAVIS AVE
Built 1973
I-85 over W JEFF DAVIS * I-65
Built 1973
I65 RAMP 52 over W.JEFF DAVIS AVE
Built 1972
RAMP 59 over I65 AND RAMP 53
Built 1973
I85 over ROSA PARKS
Built 1971
I65 NBL / SBL over MILL ST
Built 1971
I65 SBL/NBL over DAY ST
Built 1973
FAP 94 (DAY ST) over OAK ST
Built 1973
FAP 94 (DAY ST) over OAK ST
Built 1973
Bridge Details
- Structure #
- 010505
- Year Built
- 1971
- Length
- 151.8 m (498 ft)
- Max Span
- 53.3 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 7,440
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,593,000
- Total Project Cost
- $5,052,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.