GROOVER DR over SHADES CREEK
GROOVER DR * SHADES CK · County 073, Alabama · Built 1969 · 2 Lanes · 2,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.508706, -86.731939
This bridge is in worse condition than 35.5% of bridges in County 073. The average bridge in Alabama is 0 years old; this one is 57 years old.
Nearby Bridges
LEACH DR over BRANCH
Built 1919
STONE RIVER ROAD over FURNACE BRANCH
Built 1960
OLD LEEDS ROAD over SHADES CREEK
Built 1935
WILDERNESS ROAD over FURNACE BRANCH
Built 1960
ELDER STREET over SHADES CREEK
Built 1951
BEECHWOOD ROAD over SHADES CREEK
Built 1950
I - 20 EAST over OPO MADRID BLVD
Built 1974
I - 59 SO RAMP over 80th St. North
Built 1976
OVERTON ACCESSRD over I - 459
Built 1981
I - 20 WEST over OPO MADRID BLVD
Built 1974
Bridge Details
- Structure #
- 010080
- Year Built
- 1969
- Length
- 31.1 m (102 ft)
- Max Span
- 10.4 m
- Width
- 12.8 m (42 ft)
- Lanes
- 2
- Daily Traffic
- 2,500
- Material
- Concrete
- Design
- Channel Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,141,000
- Total Project Cost
- $1,255,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.