HAGLER COALING RD over BIG SANDY CREEK

3.9 MI N OF JCT US NO 82 · County 125, Alabama · Built 1968 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
009821
Year Built
1968
Length
72.5 m (237.9 ft)
Max Span
10.4 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,761,000
Total Project Cost
$1,937,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.