ADVENT CIRCLE over I - 59

3.5 MI N CAHABA RIVER · County 073, Alabama · Built 1967 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
009242
Year Built
1967
Length
83.2 m (273 ft)
Max Span
22.9 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,917,000
Total Project Cost
$2,109,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.