DEERFOOT PKWY over I - 59

I-59 * DEERFOOT PKWY. · County 073, Alabama · Built 1989 · 7 Lanes · 1,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
014781
Year Built
1989
Length
127.8 m (419.3 ft)
Max Span
33.1 m
Width
33.2 m (108.9 ft)
Lanes
7
Daily Traffic
1,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,076,000
Total Project Cost
$11,084,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.