NORTH HAGLER ROAD over NORTH RIVER

0.8 MI NE OF JCT US NO 43 · County 125, Alabama · Built 1966 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
009181
Year Built
1966
Length
80.2 m (263.1 ft)
Max Span
30.5 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,670,000
Total Project Cost
$1,837,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.