AL - 3 NORTH over 8 TH AVE SO

US 31 * 8 TH AVE SO · County 073, Alabama · Built 1966 · 4 Lanes · 36,335 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
009047
Year Built
1966
Length
71 m (232.9 ft)
Max Span
26.8 m
Width
16.8 m (55.1 ft)
Lanes
4
Daily Traffic
36,335
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,067,000
Total Project Cost
$3,374,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.