HIGHLAND AVE over AL - 3
HIGHLAND AVE. · County 073, Alabama · Built 1966 · 3 Lanes · 7,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.502261, -86.789486
This bridge is in worse condition than 35.5% of bridges in County 073. The average bridge in Alabama is 0 years old; this one is 60 years old.
Nearby Bridges
AL - 3 NORTH over ARLINGTON AVE
Built 1965
AL - 3 SOUTH over ARLINGTON AVE
Built 1965
RAMP TO 22 ND ST over ARLINGTON AVE
Built 1965
AL - 3 NORTH over 10 TH AVE SO
Built 1966
AL - 3 SOUTH over 10 TH AVE SO
Built 1966
AL - 3 NORTH over 8 TH AVE SO
Built 1966
AL - 3 SOUTH over 8 TH AVE SO
Built 1966
AL - 3 SOUTH RAMP over 7 TH AVE SO
Built 1968
AL - 3 NORTH over 7TH AVE SOUTH
Built 1968
AL - 3 SOUTH over 7 TH AVE SO
Built 1968
Bridge Details
- Structure #
- 009043
- Year Built
- 1966
- Length
- 31.2 m (102.4 ft)
- Max Span
- 14.6 m
- Width
- 88.6 m (290.7 ft)
- Lanes
- 3
- Daily Traffic
- 7,000
- Material
- Concrete Continuous
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,899,000
- Total Project Cost
- $8,689,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.