I65 SBL over STREAM

2.5 MI.S.OF US.31 · County 101, Alabama · Built 1965 · 2 Lanes · 16,060 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
008590
Year Built
1965
Length
7 m (23 ft)
Max Span
3 m
Lanes
2
Daily Traffic
16,060
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$673,000
Total Project Cost
$740,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.