I65 SBL over PINTLALA CRK.RELIEF NO 2
2.4 MI.N.OF TYSON RD. · County 101, Alabama · Built 1965 · 2 Lanes · 16,060 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.222594, -86.395103
This bridge is in worse condition than 81.2% of bridges in County 101. The average bridge in Alabama is 0 years old; this one is 61 years old.
Nearby Bridges
I65 NBL over PINTLALA CRK RELIEF NO.1
Built 1965
I65 SBL over PINTLALA CRK.RELIEF NO.1
Built 1965
I65 NBL over PINTLALA CREEK
Built 1965
I65 SBL over PINTLALA CREEK
Built 1965
I65 NBL over PINTLALA CRK.RELIEF NO 2
Built 1965
I65 SBL over PINTLALA CRK.RELIEF NO 3
Built 1965
I65 NBL over PINTLALA CRK RELIEF NO 3
Built 1965
VENABLE ROAD over DRAINAGE DITCH
Built 1965
I65 NBL over STREAM
Built 1965
I65 SBL over STREAM
Built 1965
Bridge Details
- Structure #
- 008584
- Year Built
- 1965
- Length
- 82.9 m (272 ft)
- Max Span
- 10.4 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 16,060
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,102,000
- Total Project Cost
- $2,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.