CO RD 61 over I65

4.9 MI N OF US 31 · County 001, Alabama · Built 1965 · 2 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

32.612733, -86.481086

This bridge is in worse condition than 66.7% of bridges in County 001. The average bridge in Alabama is 0 years old; this one is 61 years old.

Nearby Bridges

Bridge Details

Structure #
008558
Year Built
1965
Length
106.7 m (350.1 ft)
Max Span
29.3 m
Width
9 m (29.5 ft)
Lanes
2
Daily Traffic
1,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,302,000
Total Project Cost
$2,532,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.