CO 40 over I65

2.2 MI N OF US 31 · County 001, Alabama · Built 1965 · 2 Lanes · 700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

32.579225, -86.469894

This bridge is in worse condition than 85.5% of bridges in County 001. The average bridge in Alabama is 0 years old; this one is 61 years old.

Nearby Bridges

Bridge Details

Structure #
008557
Year Built
1965
Length
85.3 m (279.9 ft)
Max Span
21.3 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
700
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,893,000
Total Project Cost
$2,082,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.